What are you looking for ?
Advertise with us
RAIDON

Compuverde Introduced MetroStorage Solution for Dual Data Centers

Unified storage solution ensures zero downtime for critical data and applications, while reducing costs and time to deploy

Compuverde AB announced Metro cluster, an enterprise-grade, HA solution that is designed to tolerate the loss of an entire data center with zero downtime.

Click to enlarge

compuverde-metro_1
The solution has a simple deployment, which requires a low-latency connection between the sites and eliminates the need for FC, extra connectivity management, storage controllers or other types of added complexity. Company’s customer Inprove IT Infrastructure Solutions has developed a bundle offering based on HGST and Mellanox Technologies, Ltd.‘s hardware, powered with firm’s software defined storage.

The Metro cluster solution is a resilient active-active setup that synchronizes data between two separated physical locations, providing complete protection not only for ‘simple’ problems like disk, server or network failure, but also for ‘worst-case’ scenarios such as complete data center failure.

  • Simple to deploy and reduced costs: Set-up involves no special hardware and only requires a low-latency connection, up to 5ms, allowing two data centers to be placed over the same LAN while removing the traditional overhead of installing FC and other management connectivity.

  • Redundancy and availability: Data is synchronously mirrored and distributed to two independent physical locations to prevent application downtime. Active-active nodes ensure that there is no central orchestration, no complex infrastructure to set up and maintain and no single point of failure.

  • Network synchronization: The cluster is interconnected through a private, high-speed, low-latency network. This network deals with synchronization between the nodes while the public network delivers access for clients through any of the major protocols: SMB, NFS, iSCSI, Amazon S3 and OpenStack Swift.

  • Scalability: Scaling is done by installing new nodes and adding them to the primary and secondary locations. Users will see a linear increase in capacity, performance and IO/s as new nodes are added.

Click to enlarge

compuverde_productKoen de Jonge, CEO, Inprove IT Infrastructure Solutions, said: “As a supplier of IT infrastructure solutions based on open standards, our mission is to provide our customers with industry-leading technology that is flexible and doesn’t require a lot of configuration or additional training. We have found that the Metro cluster from Compuverde is very easy to deploy. You can really feel the ‘Swedish by design’ philosophy. We appreciate the flexibility and freedom we have gained with this solution.

Amit Katz, VP, WW Ethernet switch sales, Mellanox Technologies, Ltd., said: “The Compuverde Metro Cluster is a great demonstration of the performance and cost efficiency of our 100GbE networking solutions. The combination of the SN2100 100G Ethernet switch, ConnectX-4 Lx 25G adapter server connectivity and LinkX cabling achieves unmatched performance, reliability and robustness. This solution achieves HA in 1U of rackspace, with low power, and at an affordable price point.

Stefan Bernbo, CEO and founder, Compuverde, said: “A Ponemon Institute study found that unplanned data center outages cost companies nearly $9,000 per minute – not to mention damage to brand reputation. We have developed a solution that not only solves these challenges but also provides end users and MSPs alike with the reliability needed for protecting critical applications and data.

Compuverde re-invents Metro-Cluster

Articles_bottom
ExaGrid
AIC
ATTOtarget="_blank"
OPEN-E