Oracle Backup Failure
By Jean-Jacques Maleval, Thu, August 5th, 2010
Major factor in American Eagle 8-day crash
To read this article from StorefrontBacktalk, click on:
Oracle Backup Failure Major Factor In American Eagle 8-Day Crash
It seems a failure in an Oracle backup utility coupled with the failure of IBM hosting managers to detect it and to verify that a disaster recovery site was operational were the key factors in turning a standard site outage at American Eagle Outfitters into an 8-day-long disaster, according to an IT source involved in the probe.
Oracle Backup Failure Major Factor In American Eagle 8-Day Crash
It seems a failure in an Oracle backup utility coupled with the failure of IBM hosting managers to detect it and to verify that a disaster recovery site was operational were the key factors in turning a standard site outage at American Eagle Outfitters into an 8-day-long disaster, according to an IT source involved in the probe.




Print this news
